Skip to Content
Tobin Docs

Roadmap

The approved MVP-1 milestones and their status. Completion is not production readiness.

MilestoneDescriptionStatus
MVP-1.2Clearing Operations FoundationCompleted
MVP-1.3Institutional Clearing AuthorizationCompleted
MVP-1.4Settlement Preparation EngineCompleted
MVP-1.5Stellar Settlement IntegrationCompleted with limitations
MVP-1.6Institutional Operations and ReconciliationPlanned
MVP-1.7Security, Governance and Infrastructure HardeningPlanned
MVP-1.8Controlled Institutional PilotPlanned

Wallet-first authentication and institutional onboarding were delivered after MVP-1.5 as a separate piece of work (complete with limitations). It does not rename or reorder the milestones above.

Completed does not mean production-ready

Completing MVP-1.5 means the Testnet integration was built and validated within a narrow, stated scope. The versioned-release and production gates in release/RELEASE-GATES.json remain blocked, and real-value use is out of scope until the later milestones are delivered and independently reviewed.

This page mirrors the roadmap in the repository README. If they differ, the README and the owner's milestone records win; report the discrepancy.

Earlier protocol-level milestones

The repository's earlier README tracked the broader protocol design (M0 to M8) separately. That content is preserved in the README and is not reproduced here.

Closure records

On this page